
Bridge Jointing System
Recently a client had a bridge which was built in the 70’s with several large 90mm wide construction joints through it, underneath in recent years a shop had been built. The client approached Safeguard to resolve a leak in the joints, which had damaged the roof within the shop below and was still leaking.