This Project we were asked by the Builder to remove the Vinyl from the floor of a Metal Workshop in a School in the Hunter Valley and apply a specified system of Epoxy specifically for this Project.
So we removed the vinyl from the floor, then grind the old glue residues to get to the original substrate, to ensure the bond and to stop and chance of delamination. Once that was vacuumed and clean we applied a thick resin coat and broadcast sand until refusal, then left to dry. The next step was to apply 2 roll on coats of Two Pack Epoxy with colour to meet the required specifications.