Clients request was to create falls to the drains, both in the Bar and Kitchen, the void between the two needed to be flat and suitable for clients to walk around safely.
Being an and old concrete floor with glue residue a grind was required to remove all products that may cause the floor to fail.
The floor needed to be raised by 50mm in the Kitchen and 30mm in the Bar, ramped out to the void to avoid a trip hazard.
Coving to a height of 100mm to the underneath of the wall tiles.
With a Trowel coat system finish.
A slip resistance was needed to be achieved and was surpassing the P5 rating.