Removal of the existing tiles down the solid substrate approximately 60mm, then fill with a two pack epoxy and sand build up. Apply a 6mm thick Poly Urethane Concrete and a 100mm Cove flooring.
Our aim is to develop and install a flooring system that suits the Customer’s requirements that will give a floor that not only fits their needs but be long lasting!