Over the Christmas Break we were asked by a Major Hotel to redo some failing areas in the Cool Rooms, Loading Dock and Bus Parking in the Building.
The works were required to be staged and also work within certain hours as not to disturb the Guests.
The Cool Rooms required the old coating to be entirely removed back to the substrate and then recoated with a 2mm Trowel on Coat and a Single Roll on.
The Loading Dock and Bus Parking also required the old coating to be entirely removed back to the substrate and then recoated with 2 coats of a Concrete densifier to not only harden the surface but seal it to allow ease of cleaning.
A big factor in all was top ensure that the suitable surface was non-slip and easy to clean.