The clients request was to change an old toilet area into a usable space. This required the preparation of the floor and levelling with a Polymer Modified Concrete by up to 30mm and then apply 2 roll on coats of a coloured Two Pack Epoxy.
The use of the Polymer Modified Concrete allowed for the Epoxy to be applied the following day it was completed, meaning no 30 days to wait for the concrete moisture levels to be lowered for the application.