This is from a commercial kitchen in a Private Hospital, we were given a bare slab and had to Cove all the wall and floor junctions. Then apply 13mm thick Poly Urethane Concrete floor so it would resist up 120⁰ C. The entire kitchen was done in 3 stages to minimise the disruption to the Hospital and to allow them to still serve meals.